Previous Slide Next Slide

Perth Depot

Project

  • Depot Enhancements
  • Client Scotrail
  • Sector design and build

Brief

The project involved construction of a new canopy along the maintenance siding at Perth Depot.

Screw piling and  steel columns where installed to form the structure which complete with cladding provided a solution for traincare operations under shelter on this platform.

 

« Return to case studies

Work Undertaken

  • Specialist services included the following: Track drainage Power and Water systems Pumped effluent tanking system Refuelling system Oil storage and distribution system Compressed air services