The old heat meter was not giving the correct calculations of the heating system throughout the site, and was in desperate need of replacing, we were tasked to carry out a complete replacement of the meter along with the leaking joints and pipework either side of the meter.

The task was carried out with the least disruption to the site and took 13 days to complete.

H&S: Consortia carry out a risk assessment before every reactive or programmed job however small, our engineers use an information management system via their mobile phones from job start to finish that does not allow progress of the job unless the risk assessment has taken place.